Technical indicators

CP (Data Definition)

Climate suitability for the production of Sweet Sorghum

Read More

Forestry Wood resources used for electricity generation

Read More

Climate suitability for production of Groundnut

Read More

Total installed capacity of power plants connected to the National electrical grid using coal as main fuel

Read More

Read More

Mandates  for blending biofuels (Ethanol and Biodiesel) of total transportation fuel in per cent or million litres.

Read More

Total Capacity installed of power plants connected to the National electrical grid using Large Hydro (above 30MW) as the source of electricity

Read More

Electricity generated from power plants using Gas as main fuel

Read More

Climate suitability for the production of Jatropha

Read More

Generally called Renewable Portfolio Standard (RPS), renewables obligations or quota policies. A standard requiring that a minimum percentage of generation sold or capacity installed is provided by renewable energy. Obligated utilities are required to ensure that the target is met.

Read More

Climate suitability for the production of Crambe

Read More

Climate suitability for the production of Castor

Read More

A tendering system by which contracts to construct and operate specific projects or fixed quantities of renewable capacity are awarded.  Bidding for renewable power capacity can be done at the national or sub-national levels.

Read More

Quantity of Sewage used for energy production

Read More

Quantity of animal manure used for energy production

Read More

Slaughtery waste resources used for electricity generation

Read More

Solid Waste from biomass materials produced mainly from food and fibre processing industries

Read More

Climate suitability for the production of Cashew

Read More

Quantity of electricity consumed in the industrial sector

Read More

Theoretical electricity generation potential from urban liquid waste

Read More

Pages